How redevelopment works in Mumbai
Redevelopment in Mumbai is when an old building is demolished and rebuilt by a developer, who gives the existing members new, usually larger flats at no cost and pays for the project by selling extra flats built using the additional FSI available on the plot.
Why Mumbai rebuilds itself
Mumbai has very little empty land. Thousands of buildings from the 1960s to the 1990s are old, have no lifts, and use far less floor area than today’s rules allow.
That gap is the opportunity. If the plot can now carry more floor area, a developer can rebuild it, give every existing family a new flat, and still have flats left over to sell. A large share of new homes in Mumbai comes from exactly this.
This is the rook on our board: land, in straight lines. In Mumbai, redevelopment is often how the land deal happens.
The main types
| Type | What it covers |
|---|---|
| Cooperative housing society redevelopment | The most common. Governed by Section 79A of the Maharashtra Co-operative Societies Act and the government resolutions issued under it. |
| Cessed buildings | Old tenanted buildings in the island city, with their own rules under DCPR 2034 (Regulation 33(7)) and MHADA. |
| Cluster redevelopment | Several plots rebuilt together as one larger scheme, under DCPR 2034 Regulation 33(9). |
| Slum rehabilitation | Slum dwellers rehoused in new buildings, with the developer earning extra area to sell, under Regulation 33(10). |
| Self-redevelopment | The society rebuilds without a developer, raising money and appointing a contractor itself. |
Society redevelopment, step by step
This is the broad path for a cooperative housing society. The exact procedure is set by the government resolution in force, so treat this as a map, not a checklist.
- Members raise the idea. A request for redevelopment is placed before the managing committee.
- A general body meeting decides to explore it. Members discuss and decide whether to proceed.
- A PMC (project management consultant) is appointed to study the building and prepare a project report.
- Feasibility. The PMC works out how much floor area the plot can carry and what members could realistically get.
- Tender. The society invites offers from developers, through public notices.
- Choosing the developer. Offers are opened and compared, and the developer is selected in a special general body meeting. Under the 2019 resolution, this needs written approval from at least 51% of members.
- Agreements. The society signs a development agreement with the developer, and each member signs an agreement for their new flat.
- Approvals. The developer gets plans approved and the project registered with MahaRERA if flats are sold.
- Moving out. Members move to temporary homes, usually with rent paid by the developer.
- Construction and return. The new building is completed, the occupation certificate is issued, and members move back.
What a good deal looks like
- Clear area: the new carpet area for every member, written into the agreement.
- Rent and shifting costs for the whole construction period, with a plan for delays.
- A realistic timeline, with penalties if it slips.
- Security: some form of guarantee from the developer, decided with the general body.
- A developer with a track record. Check their past projects on the MahaRERA website.
Why redevelopment deals fail
Most stalled projects fail on the same few things: members who cannot agree, a developer who runs short of money halfway, or approvals that take far longer than planned. The fix is almost always the same: honest numbers at the start, and a developer who can fund the gap.
Questions people ask
How many members must agree to redevelopment?
Under the Maharashtra government resolution of 4 July 2019 issued under Section 79A, the developer must be approved by at least 51% of the society's members, in writing, at a special general body meeting. The procedure was reported to be revised in 2026, so check the current resolution with the Co-operation Department or a lawyer before you rely on any figure.
Who pays for redevelopment?
In a typical project the developer pays for construction and the members' temporary rent, and recovers it by selling the extra flats. In self-redevelopment, the society itself raises the money and appoints the contractor.
Do members get bigger flats?
Often, yes. How much bigger depends on the FSI available, the location and the offer the society negotiates. Nothing is automatic.
What is a PMC in redevelopment?
A project management consultant appointed by the society to prepare the feasibility report, run the tender process, and protect the members' interests.
Sources
Rules change. Always confirm on the official source before you act. Checked on 16 November 2026.
- MHADA, Section 79A information (PDF)
- Commissioner for Cooperation and Registrar, Maharashtra
- MCGM (BMC), Development Plan and DCPR 2034
This page explains how things work. It is not legal, tax or investment advice.
Keep reading
- What is real estateThe complete guide, with an India and Mumbai lens.
- What is FSIFSI (Floor Space Index) is the ratio of the total floor area you are allowed to build to the area of the plot, so an FSI of 2 on a 1,000 sq m plot allows 2,000 sq m of built floor area.
- How real estate developers make moneyA real estate developer makes money by buying the right to build on land, getting approvals, funding construction partly with buyers' money, and selling the finished floor area for more than the total cost of land, approvals, construction, finance and sales.
- What is an occupation certificate (OC)An occupation certificate (OC) is the document issued by the local planning authority, such as the BMC in Mumbai, confirming that a building has been built as per its approved plans and can legally be occupied.